Footwear sourcing & supply partner

Source better footwear — concept to shipment.

Material libraries, vetted factories, tight sample cycles and production planning under one roof. We help brands, retailers and distributors build private-label lines that actually ship.

120+Vetted factories
9MPairs / year placed
32Countries shipped
AQL 2.5QC standard
Footwear sourcing studio — materials library, shoe samples and sole molds MATERIALS SAMPLING DISPATCH
Scroll
Material libraries·Sample cycles·Cost engineering·Production planning·Quality control·Global logistics· Material libraries·Sample cycles·Cost engineering·Production planning·Quality control·Global logistics·

The source path · 07 stages

From sketch to container.

A repeatable seven-stage pipeline. Every stage has an owner, a deliverable and a checkpoint.

Material library · 06 staples

Pick a swatch.

A working library of vetted materials. Tap a swatch to read its spec and lead time.

Product categories · 06 lines

We source all of it.

Sourcing brief builder

Scope a line in 60 seconds.

Set the category, volume, target price and timeline. The summary updates live — submit it and our team replies with a sample plan.

Quantity5,000 pairs
Target price / unit₹1,700

Footwear quality-control lab station with inspection jig and measuring tools AQL 2.5 · ISO-aligned

Quality lab

Checked before it ships.

  • 01

    Sample approval

    Sealed golden samples and tech packs signed off before bulk.

  • 02

    In-line checks

    Stitching, bonding and last-fit audits through production.

  • 03

    Final inspection

    AQL sampling, fit and finish, packaging and labelling.

  • 04

    Lab testing

    Adhesion, flex, colour-fastness and restricted-substance screening.

Private-label launches

Lines we've shipped.

180k

Street sneaker drop

A retailer's first private-label capsule — concept to shelves in 14 weeks.

42%

Cost re-engineering

Midsole and material swap cut landed cost without changing the look.

Distributor scaling

From one silhouette to a 12-SKU line across three seasons.

Talk to sourcing

Let's build your line.

Send your company and email — a sourcing lead gets back within two business days.